Thursday, April 7, 2011

Daily research on Cisco solution 07/04/2011

Week 5 Day 4 while doing vCenter Server Networking Practical, i had discover some obstruction that stop me from moving on. it is confirm that HA,DRS, Vmotion, creating host in cluster and vNetwork Distributed switch need license, i had fail to do cold migration as there a error msg the object or item referred could not be found and i am sure about whether it had to do with license again . from early testing this morning i had also confirm that vCenter Server cannot be installed in a domain controller as they are using the same port (389). i had also revise on the window server 2008 about FTP, DHCP, setup domain controller, group policy

Daily Report on Reseach for FYPJ: 07/04/11

After done research on Power Factor topic and started to enhance on the powerpoint slides. Overloading of UPS is still quite unclear and resources in the web are somehow similar. Most of the resource are from APC web. But managed to add in overloading protection as to increase the objective of this topic. As Discussed with chee hau on the ESXi software and cleared some doubts with him. But having one doubt, which is whether our personal equipment(laptop) able to support the requirement needed for the whole practical.

Daily Research Report For FYPJ @ 7 April 2011

Started doing on Topic 5: Power Factor & Overloading,
looked through the slides and made some plans in what to edit and to be change.
Did further research to elaborate more on "Power Factor" as previously was not detailed enough.
This topic is near completion as i think the portion about overloading can be further enhanced.
we had a small discussion with cheehau about issue regarding the lab practical, got to know the result of the softwares and also what to take note while doing it.