Saturday, October 16, 2010

MidTerm Presentation, Research on IxChariot,Phase 1 & 2, streaming to client

13 October 2010 (Wednesday),

We do the research for he phase 2, continue with checking of all our documentation and PowerPoint do some touch up for the 14October 2010(Thursday) 3-5pm presentation.

After lunch we go correct the IP camera from Ms arthi to continue testing for our phase 2 at the lab that allocated for our group to do testing, after some time of testing on the VLC Media Player using the rtsp codes, Peng Chin voice out say maybe we try follow the resolution of the width and height shown on the browser with the IP camera to the VLC Media Player of the coding "rtsp://192.168.1.12/h264.sdp?res=half&x0=0&y0=0&x1=2560&y1=1600&qp=26&ssn=1&doublescan=0&bitrate=2048&fps=1" on the code that is bolded are the resolution of the width and height this is very important because if not match with the IP camera it will not not stream to the client. After that we succeeded everyone in the team so happy and we quickly inform our supervisor on the good news. As I inform the good news I also ask him to give some comments on the RACI Matrix, Project Charter and PowerPoint slides.

-------------------------------------------------------------------------------------------------

14 October 2010 (Thursday),

Our supervisor send us comments and I continue edit the things that our supervisor comment in a notepad to the sharedrive, I very happy because the comments is so useful as some of the changes is the careless that we miss out. We asked our supervisor for some advise on how he want us to show the demonstration on the phase 1 & 2 for the presentation this coming afternoon, Finally we had come to the final decided to show the phase 1 on my laptop by using the VLC Media Player as we will open two VLC one will be the streamer and other one will be the client, after we demo on the phase 1 we also explain on the phase 2 bacause the steps is similar but have some extra things like the rstp codes. after that we start to plan who want to present which slides as we follow the point of each other. After the presentation at the lab L628 we are so happy as most of the question asked by Mr Siva and Mr Mark Lim to our group is able to answer it, as we went down back to the lab we inform our supervisor everything are going smoothly. After that we do some editing on the some of the feedback by Mr Siva and Mr Mark Lim.

-------------------------------------------------------------------------------------------------

15 October 2010 (Friday),

We continue on the feedback and to we did the most is the research on IxChariot "IxChariot is the industry's leading testing tool for simulating real-world applications to predict device and system performance under realistic load conditions. Comprised of the IxChariot Console, Performance Endpoints. IxChariot provides the ability to confidently assess the performance characteristics of any application running on wired and wireless networks". At 3:26pm our supervisor Mr Lam came to look for us as he want to see our streaming for the phase 2 but we can't get our camera as the teacher was busy. So our supervisor told us we must start praparation for the week12 PowerPoint slides, Report, Do the last touch up on all the Phase 1 and 2 documentation and mid-term PowerPoint slides as he say that if the software arrival we will not have the time to do all this. He ask any comment from our group, we say that as usual try to get a room for our group or a locker so that we can keep our switch, IP camera, cables, etc.

-ThomasQuek =)

No comments: